Q1. Two horse can
complete a race of 5.4 km in 9 min and 6 min respectively. On a
particular day, the faster horse gives a lead of 600 meters to the
slower horse for race of 5.4km and both horses reach the destination
at same time, then calculate the speed of slower horse on that day if
faster horse ran with his usual speed?
(a) 54 km/hr
(b)
48 km/hr
(c) 36 km/hr
(d) can’t be determined
(e) 72
km/hr
Q2. Two filling pipes A and B can fill an empty tank
in 16 hours and 24 hours respectively. Pipe A start filling alone and
after 4 hours pipe B was also opened. When 50% of tank was filled, a
leak was developed which could make empty the completely filled tank
in 32 hours. It took 6 hours to find and close the leak. In how much
time the tank was filled from start?
(a) 11 hr.
(b)
15 hr.
(c) 13 hr.
(d) 12.4 hr.
(e) 16 hr.
Q3.
Two trains P and Q start running from Kanpur to Bhopal and Bhopal to
Kanpur respectively. Both trains start at 8:00 A.M. If the distance
between Bhopal and Kanpur is 720 km and if speeds of train P and Q is
80 km/hr and 90 km/hr respectively, then at what distance from Kanpur
both trains meet?
(a) 340 km
(b) 6540/17
km
(c) 6480/17 km
(d) 5760/17 km
(e) None of
these
Q4. In how many ways the letters of the word
‘CICUMSTANCES’ can be arranged such that all vowels came at odd
places and T always comes at end of each letter?
(a)
115200
(b) 215200
(c) 120150
(d) 121500
(e)
114200
Q5. A mixture of 240 liters contains milk and water
in the ratio of 5 : 3. A milkman mixes some more water in it and
claim to sell it at cost price. If cost price of pure milk is Rs.
20/liter and water is freely available and milkman made a total
profit of 80% on cost price of pure milk then find amount of water he
mixed in the milk.
(a) 40 liters
(b) 30 liters
(c)
20 liters
(d) 35 liters
(e) 45 liters
Solutions
(1-5):
Directions
(6-10): The table given below shows the number of days taken by six
workers to complete five different tasks in a field individually.
Study the table carefully to answer the questions based on it.
Q6. If Ashfaq
started digging alone and was coordinated by Mayank and Jatin
respectively on alternate days from next day, find the number of days
taken by them to complete the work?
(a) 32/3 days
(b) 47/4
days
(c) 28/3 days
(d) 39/4 days
(e) 14 days
Q7.
Lokesh, Faisal and Jatin started watering in the field. But after 2
days Lokesh left and Jatin also left 2 days before completion of
work. Find total number of days Faisal worked?
(a) 7 days
(b)
9 days
(c) 8 days
(d) 10 days
(e) 15 days
Q8.
What is the difference in the number of days taken by Rakesh and
Mayank together for seeding and than that of by Faisal and Jatin
together for watering?
(a) 15/4 days
(b) 167/35 days
(c)
120/31 days
(d) 132/35 days
(e) None of these
Q9.
What is the ratio of the average number of working days of Rakesh and
that of Faisal if they have completed all the activities
individually?
(a) 17 : 16
(b) 16 : 17
(c) 17 : 17
(d)
19 : 20
(e) 13: 15
Q10. Mayank, Faisal and Rakesh
together started ploughing while at the same time Jatin, Lokesh and
Ashfaq started watering. What is the time difference in the
completion of the two works?
(a) 232/67days
(b)
24/7days
(c) 10/7days
(d) 98/67days
(e) None of
these
Solutions (6-10):
No comments:
Post a Comment